Trunk Sewer Line Involves Combination of Open Trench and Underground Drives
PCL Civil Constructors Inc., San Diego, Calif., currently is constructing approximately five miles of the Rose Canyon Trunk Sewer in San Diego, Calif., under a $23.8 million contract with the City of San Diego.  The line is a combination of open-cut sections and six underground drives.  The underground drives, which account for one-sixth of the total length, are required because in several areas the line passes under Caltrans or railroad right-of-way property where an open cut is not possible.  In several other areas the depth of the new sewer pipeline, as much as 45 feet, makes an open-cut trench impractical, according to Rick Selensky, resident engineer for the City of San Diego.
See case history »